Eye Wash and Shower Combination Unit

Lab PP Cup Sink
January 5, 2017
laboratory PP cup sink
January 22, 2017

Eye Wash and Shower Combination Unit

• Application Provide full-body relief from contamination fastty and effectively

• Materials:AES plastic + 304 Stainless Steel

• AES plastic has weather resistance properties and applys to indoors or outdoors

• With good acidproof .alkali prevention performences,304SS is ideal for harsh environment

• Pull rod with triangular handle is easy to operate for showers

• The design with equal length of main pipes makes packaging more compact so that helps to save space and cost

• Equiped with flat washer in qiuck coupling to prevent leakage between joints and fitting

• Flow regulator is built in shower arm tube

• The shower head delivers a large volume flushing fluid spread evenly in a precise pattern and controlled flow rate.

• Be activated by push handle or foot pedal easily

• The coin slot hidden faucet aerator is esay to remove and clean

• Dust cover is removed once unit started

• Comply with ANSI Z358.1-2014 and AS 4775-2007

    

Eye Wash and Shower Combination Unit

  Row Rate (U min)Water BowlShowerValve   Packing    
Product

Main

Material

Eye/

Face

Wash

ShowerDx H/cm: 32×9.5Dx H/cm: 255×7.51/2″1″hletOutlet

Pressire

KPa

size

LxWxH

G.W.

(kgs.)

N.W.

(kgs.)

CertificationModel
  

AES

plastic

304

SS

AES

plastic

304

SS

   (cm)  

Combination

Unit

304

Stainless

Steel

11.475.7 V VVVrr210

120×40

x26.5

12.49.4ANSIZ358.1 AS 4775 CSA CEWG7053F

 

QUICK COMPLIANCE GUIDE Combination Unit

1Valve mechanism activates in one second or less;it stays open until manually closed.(Section 4.2, 5.2, 6.1.4, 6.2)
2Be connected to a system capable supplying adequate flushing fluid when all components are oprated simultaneously.(Section 4.5.5, 7.4.4)
3Height of the flushing fluid column pattern shall be between 82″(208.3cm) and 96″(243.8cm) above floor.(Section 4.1.3, 4.5.4)
4Watersupply shall be sufficient to supply at least 20GPM(75.7LPM) for 15 mimutes.(section 4.1.2,4.5.5)
5Valve actuator shall be located not more than 175.3cm(69″) above floor.(section 4.2)
6The diameter shall be minimum of 50.8cm(20″) at 152.4cm(60″) above floor.(section 4.1.4)
7Center of the flushing fluid pattern shall be at least 16″(40.6cm) from any obstruction.(Section4.1.4 ,4.5.4)
8

Water flow pattren shall be positioned between 33″(83.8cm) and 53″(134.6cm)from the level on which user stands+

and 6″(15.3cm) minimum from the wall or nearest obstruction.(Section 5.4.4, 6.4.4)

9Deliverd at least 3.0 gallons(11.4liters) of water per minute for 15-minute(Section 6.1.6,6.4.5)
10Construted of materials that will not corrode in the presence of the flushing fluid(Section 7.1.1,7.1.2, 7.1.3)
11Located 10 seconds or 55 feet from contaminants or hazardous materials. Locate on the same level as hazard and free of obstructions.(Section 7.4.2, B5)
12Protect nozzle head from airborne contamination,dust covers shall be removed by water flow immediately (Section 5.1.3,6.1.3)
13Provided flushing fluid to both eye and face simultaneously at a velocity low enough without injuty to skin (Section 5.1.1,6.1.1)

 

 

1. Water delivered by combination unit shall be tepid (60-100°F/16-38°C) (Section 4.5_6,5.4_6,6_4_6,B6)

2. 15-minute Flush Required combination unit shall provide at least 3.0gpm(11.4lpm) of water for 15 minute (Section 7.4.5.B6)

3. Identification Be located in an area identified with a highly visible sign,the area around the fixtures shall be well-lit. (Section 7.4.3)

4. Training Instruct all employees who maybe exposed to hazardous materials in the location and proper use of emergency fixtures.(Section 7.5.4)

5. Weekly activations & Annually insections Activate combination unit at least weekly and inspect annually for compliance with requirements of ANSI-Z358.1 (Appendix B2)

6. Recommend to connect a flushing fliud supply at a flow pressure of 210kPa(30psi)(Appendix B2)

 

 

 

 

Leave a Reply