THREE WAY BENCH FAUCET
Installation steps
1. Fixed pedestal
Before installation, flush the water inlet pipe, select the installation location, bore on the worktop with hole diameter 33mm, loosen the base lock nut and the top screws on both sides, remove the base and fix it to the tabletop as shown.
2.Connect the inlet pipe
Put the water outlet end of the hose through the base hole and screw it tightly to the lower end of the main body
3.Fixed main body
Install the elbow pipe on the main body and turn the handle to the closed state and open the pipeline valve, check the connection to make sure there is no leakage and insert the main body into the base, after aligning the direction tighten the top wire and lock nut to fix the main body.
4.Clean the filter screen
Close the pipeline valve, and loosen the lock nut on the base and the top screws on both sides from worktop.
Pull out the main body, loosen the lock nut of the hose, take out the filter at the inlet end of the main body for cleaning.
|